Awarded Tenders/المناقصات التي تم ارسائها

The New Port Project Steering Committee is pleased to announce the following awarded tenders for the New Port Project.

Package Contractor/Consultant
Awarded Amount
Start Date
Forecast End
Scope Contact
NDPP/0001: Port Location and Study Tendering Scott Wilson
QAR 19,628,113
Q2 2007
Q1 2008
Details

Port Location and Study Tendering

Scope includes determining the location and layout of the planned Port, including management and technical support associated with the future management of the Port.

x
Details

Scott Wilson (URS Qatar LLC)

P.O. Box 22108

5th Floor, Office #15, 16, 33

Bin Jaham Al Kuwari Compound

Al Sadd Street

Doha, Qatar

Tel: +974.4413.0834

Fax: +974.4413.0835

Website: www.urs-scottwilson.com

x
NDPP/0001B:Landing and Marine Site Investigation GEMS
QAR 5,128,099
Q1 2008
Q2 2008
Details

Landing and Marine Site Investigation

Scope includes onshore/offshore site investigations, insitu/laboratory tests and exploratory works required for acquisition of data and information required for the Port Location studies for the New Port Project.

x
Details

GEMS Qatar LLC

P.O. Box 63596

Doha, Qatar

Tel: +974.4481.2641

Fax: + 974.4435.6635

Email: [email protected]

Website: www.gemsqatar.com

x
NDPP/0002: Engineering Design Consultant WorleyParsons
QAR 121,724,046
Q4 2008
Q3 2016
Details

Engineering Design Consultant

Scope includes comprehensive Engineering Design Consultancy Services, including review of conceptual design, master planning, design management, preliminary design and cost estimating , scoping of supplementary investigations, geotechnical baseline report, technical specifications, hydrodynamic and physical modeling, ship maneuvering study, final design, tender drawings, specs, BOQ’s and quantities, management of building design consultants, technical assistance during tender evaluations and technical services during construction.

x
Details

WorleyParsons Services Ltd.

Al Mana Tower, 8th floor

Suhaim Bin Hamad Street C-Ring Road

Doha, Qatar

Tel: +974.4499.9777

Fax: +974.4499.9800

Website: www.worleyparsons.com

x
NDPP/0003: Programme Management Consultant AECOM
QAR 543,746,145
Q4 2008
Q3 2016
Details

Programme Management Consultant

Scope includes comprehensive programme management services, including planning, design reviews, constructability reviews, program scheduling and cost control, procurement/contract management, risk management, cost estimating, document control, construction supervision, program safety, operational reviews, commissioning, quality assurance/quality control, etc.

x
Details

AECOM

4th Floor, The Pearl Building

Airport Road, Umm Ghuwalina

Doha, Qatar

Tel: +974.4407.9000

Fax: +974.4437.6782

Email: [email protected]

Website: http://www.aecom.com/

x
NDPP/0004: Environmental Consultant COWI A/S
QAR 26,421,566
Q1 2009
Q3 2016
Details

Environmental Consultant

Scope includes preparing and submitting Environmental Impact Assessments (EIA), coordinating/liaising with Project consultants and other applicable stakeholders in order to determine the nature and extent of the works to be assessed in the EIA studies. Works also includes other environmental services, including management and construction administration of environmental and hydrogeological investigations and environmental monitoring and compliance monitoring packages.

x
Details

COWI A/S Qatar

P.O. Box 23800

Al Mana Tower, 8th floor

Suhaim Bin Hamad Street C-Ring Road

Doha, Qatar

Tel: +974.4498.2338

Fax: +974.4498.2336

Email: [email protected]

Website: http://www.cowi-gulf.com

x
NDPP/0005: Supplementary Site Investigations GEMS
QAR 22,520,102
Q3 2009
Q4 2011
Details

Supplementary Site Investigations

Scope includes all onshore/offshore site investigations, insitu/laboratory tests and exploratory works required for acquisition of data and information that is required by the Engineering Design Consultant for the design of the New Port Project. Works also include topographic survey, validation of survey, geotechnical investigations, pump tests, sediment sampling, water quality sampling, etc.

x
Details

GEMS Qatar LLC

PO Box 63596

Doha, Qatar

Tel: +974.4481.2641

Fax: + 974.4435.6635

Email: [email protected]

Website: www.gemsqatar.com

x
NDPP/0011: Environmental & Hydrogeological Investigations Qatar Industrial Lab
QAR 2,063,413
Q2 2010
Q1 2012
Details

Environmental & Hydrogeological Investigations

Scope includes hydrogeological investigation of the New Port Project required for the Environmental Impact Assessment. Works include drilling and environmental soil sampling, drilling of 16 boreholes to maximum of a 20m depth, drilling of larger diameter pumping wells, drilling of observation boreholes, soil sampling at various depths for environmental analysis, additional boreholes and sampling for potentially contaminated sites, groundwater monitoring, etc.

x
Details

Qatar Industrial Laboratories

P.O. Box 10415

Street #43, Gate #51

Industrial Area

Doha, Qatar

Tel: +974.4460.1739

Fax: +974.4460.1484

Website: www.qilqatar.com/

x
NDPP/0009: Port Basin and Inner Breakwaters CHEC
QAR 3,204,800,000
Q1 2011
Q3 2015
Details

Port Basin and Inner Breakwaters

Scope includes excavation of the entire port basin, onshore placement of engineered fill to site formation level along with the construction of the inner breakwaters, quay walls, revetments and any flood protection bunds. Works include port basin excavation, quay walls, block walls, embedment, quay furniture, site formation works, ground improvement, leveling and compaction of formation level, temporary site access road, controlled flooding of port basin, etc.

x
Details

China Harbour Engineering Company (CHEC)

P.O. Box 491

10th floor, Al Mana Tower

Doha, Qatar

Tel: +974.4462.0117

Fax: +974.4462.2517

Email: [email protected]

Website: www.chec.bj.cn/

x
NDPP/0012: Environmental Compliance Monitoring DAR Al-Handasah
QAR 50,454,926
Q1 2011
Q2 2016
Details

Environmental Compliance Monitoring

Scope includes monitoring of construction activities during the entire construction period to ensure compliance with the environmental permit conditions. The Environmental Consultant is responsible for tendering and contract administration of this package. Package scope also includes environmental monitoring, monitoring noise and vibrations generated by construction activities, monitoring excavation and disposal sites, dredging, excavation and dewatering activities, etc.

x
Details

DAR Al-Handasah

P.O. Box 40358

Burj Al Gassar, West Bay, 8th Floor

Doha, Qatar

Tel: +974.4465.4800

Fax: +974.4465.4989

Email: [email protected]

Website: www.dargroup.com

x
NDPP/0014: Insurance Brokerage Services Jardine Lloyd Thompson
QAR 547,500
Q2 2011
Q1 2016
Details

Insurance Brokerage Services

Scope includes Consultancy Services for placement and oversight of Owner Controlled Insurance Program for all works, as well as claims management.

x
Details

Jardine Lloyd Thompson

6 Crutched Friars

London, United Kingdom

EC3N 2PH

Tel: +44.020.7528.4000

Fax: +44.020.7528.4784

Email: [email protected]

x
NDPP/0010: Environmental Sampling & Laboratory Testing Gulf Laboratories
QAR 2,593,450
Q2 2011
Q3 2016
Details

Environmental Sampling & Laboratory Testing

Scope includes sampling of groundwater and extensive chemical analysis of soil, sediment, seawater and groundwater required for the Environmental Impact Assessment. Works also include sampling of groundwater from approximately 90 boreholes, onsite testing of physical parameters and laboratory chemical analysis of samples taken by others.

x
Details

Gulf Laboratories Co. WLL

P.O. Box 4024

Junction of Street 2 and Al Kassarat Street

Salwa Industrial Area

Doha, Qatar

Tel: +974.4460.7036

Fax: +974.4460.7628

Email: [email protected]

x
NDPP/0015: Site Investigation for QEZ3 MTEC
QAR 10,550,253
Q3 2011
Q1 2012
Details

Site Investigation for QEZ3

Scope includes all onshore/offshore site investigations, insitu/laboratory tests and exploratory works required for acquisition of data and information that is required by the Engineering Design Consultant for the design of the Qatar Economic Zone 3 Industrial Canal. Works also include topographic survey, validation of survey, geotechnical investigations, sediment sampling, water quality sampling, etc.

x
Details

Al Mustafawi Trading & Engineering Company W.L.L.

P.O. Box 22103

Doha, Qatar

Tel: +974.4465.4414

Fax: +974.4465.4405

Email: [email protected]

x
NDPP/0032: Port Operations Consultant Portia
QAR 4,537,586
Q3 2011
Q4 2012
Details

Port Operations Consultant

Scope includes assisting the New Port Project Team on facets of Port Operations to aid in the transition from a construction project to a world class port operation. Additional services include providing advice and recommendations on operating and maintenance system requirements and operating strategies for the various terminals. Work also involves integration of port systems, identification of design and operational risks and application of risk responses into the Operational and Maintenance Plans for the port.

x
Details

Portia Management Services Ltd

Maritime Centre

Port of Liverpool, United Kingdom

L21 1LA

Tel: +44.151.949.6262

Email: [email protected]

x
NDPP/0020: Project Surveyor MTEC
QAR 12,180,500
Q3 2011
Q3 2015
Details

Project Surveyor

Project Surveyor scope includes verification of land and marine surveys that are to be performed by various contractors. Will act as a Client’s surveyor across all construction packages and is responsible for monitoring, verifying and reporting land and marine survey activities performed by all contractors.

x
Details

Al Mustafawi Trading & Engineering Company W.L.L.

P.O. Box 22103

Doha, Qatar

Tel: +974.4465.4414

Fax: +974.4465.4405

Email: [email protected]

x
NDPP/0021: Independent Testing Services Fugro
QAR 12,063,417
Q4 2011
Q4 2015
Details

Independent Testing Services

The Consultant’s scope includes providing third party quality assurance for construction materials and methods provided by all Contractors on the project. Work includes conducting independent testing of construction materials and methods and evaluation of Contractor’s quality program.

x
Details

Fugro Peninsular

P.O. Box 47167

Doha, Qatar

Tel: +974.4432.3879

Fax: +974.4441.8958

Email: [email protected]

x
NPP/0027: HR Services Ernst & Young
QAR 1,165,000
Q1 2012
Q2 2012
Details

HR Services

Scope of services includes developing organization roles, functions and respective compensation plans. Work includes creating complete guidance manual, including policies, procedures and flow charts, including customized forms and letters covering salary, benefits, office, administration and human resources policies.

x
Details

Ernst & Young Qatar

10th Floor, Al-Abdulghani Tower

Airport Road

Doha, Qatar

Tel: +974.4457.4111

Fax: +974.4441.4649

Email:[email protected]

x
NPP/0013: Dredging, Reclamation & Breakwater Construction MEDCO
QAR 4,492,753,133
Q1 2012
Q1 2016
Details

Dredging, Reclamation & Breakwater Construction

Scope includes all works associated with dredging to the Phase 1 design depths, the West Channel and Access Channel and to the limits of Package 1. Works also include enabling works, works security, all temporary works related to the Contractor’s works, West Channel dredging, Access Channel dredging, placement of dredged material (onshore/offshore), outer breakwater, removal of plug (shoreward limit of dredging works), etc.

x
Details

Middle East Dredging Company (MEDCO)

P.O. Box 24745

4th Floor, Al Fardan Plaza Building

Al Sadd Street

Doha, Qatar

Tel: +974.4442.6762

Fax: +974.4426.7522

Email:[email protected]

x
NPP/0028: Legal Services Simmons & Simmons
'On Call' Fees
Q3 2012
Q2 2016
Details

Legal Services

Scope includes providing legal services specializing in application/interpretation of Qatari Laws, construction law as it affects contractors, maritime law as it affects port operations, development of concession agreements with operators and dispute resolution.

x
Details

Simmons & Simmons

P.O. Box 23540

Al Corniche Street

Doha, Qatar

Tel: +974.4409.6700

Fax: +974.4409.6701

Email: [email protected]

x
NPP/0024: Port Security (Construction Phase) Qatar Security Services
QAR 24,999,757
Q3 2012
Q3 2016
Details

Port Security (Construction Phase)

Scope includes the preliminary requirements for site security during the construction phase. Works include all Port security requirements during the construction phase including, as required, additional security fencing, security gates, security lights, security communication system, security surveillance system, operation and maintenance of Port security during construction phase, etc.

x
Details

Qatar Security Services

P.O. Box 60072

Al Khor, Qatar

Tel: +974.4472.1148

Email: [email protected]

x
NPP/0030: Supply of Temporary Personnel SPIE Oil & Gas Services
QAR 34,065,627
Q4 2012
Q1 2014
Details

Supply of Temporary Personnel

Scope of works generally comprises providing temporary personnel on an as and when required basis for periods up to a maximum of 24 months for various disciplines in support of the NPP project team.

x
Details

SPIE Oil & Gas Services

P.O. Box 14670

Doha, Qatar

Tel: +974.4437.5802

Fax: +974.4436.3214

Email: [email protected]

Website: www.spie.com

x
NPP/0017: Building Design Consultant Arab Engineering Bureau
QAR 31,500,000
Q4 2012
Q3 2014
Details

Building Design Consultant

Scope of works generally comprises the design of the Port buildings, excluding infrastructure. Works include architecture, structural, mechanical, electrical, civil, landscape and interior design from concept design through to issue of construction documents. The work covers the generation of a theme guide specifying design types, material, colors and landscaping. It also includes assistance in the tendering process leading to the award of Contract for construction works and construction support services.

x
Details

Arab Engineering Bureau

P.O. Box 1148

Doha, Qatar

Tel: +974.4406.8888

Fax: +974.4447.7868

Email: [email protected]

x
NPP/0026: Container Terminal infrastructure and Utility Buildings Teyseer Contracting Company W.L.L/Consolidated Contractors Group S.A.L(Offshore)(CCC)
QAR 1,064,966,000
Q1 2013
Q1 2016
Details

Container Terminal infrastructure and Utility Buildings

The scope of work includes the construction of 28km’s of port roads and fifteen major intersections, the development of a 72Ha paved container terminal with 1200 meters of quay, refrigerated container and hazardous material container handling facilities. The development of a 340 MW electrical distribution network, and nine port administration and operations buildings. The installation of a telecommunications and data network, potable water storage and supply facility, foul water collection and treatment, storm water drainage and fire-fighting systems.

x
Details

Teyseer Contracting Company W.L.L / Consolidated Contractors Company Joint Venture

Tel no: +974 4463 7111

Fax no: +974 4466 7975

P.O. Box: 23897

Email: [email protected]

x
NPP/0018: Navy Base Building Design Consultant Rosser / ECG
QAR 176,069,403
Q1 2013
Q2 2016
Details

Navy Base Building Design Consultant

Scope of works generally comprises the design of buildings for the Qatar Emiri Naval Forces Base (QENFB) excluding infrastructure works related to:

  • Design of buildings for the QENFB (Excluding infrastructure facilities)

  • All disciplines; Architecture, Structural, Mechanical, Electrical, Civil, Landscape and Interior Design

  • All phases; Concept Design through Issuance of Construction Documents

  • Generation of a Theme Guide for the project; specifying design types, materiality, colours, landscaping, etc.

  • Assistance in the Tendering process leading to the award of Contract for built works.

  • Construction support services, answering of technical queries, reviewing design submittals, analysis of Contractor proposed alternates, etc.

    x
Details

Rosser / ECG

Building 3, Office 5, Al Mirqab Souq,

Salwa Road,

Doha, Qatar

Tel:+974 4415 6874

Fax:+974 4469 1573

PO Box 24071

Email address for ECG: [email protected]

Email address for Rosser: [email protected]

x
NPP/0034: Project Site Office QSEC
QAR 49,783,327
Q1 2013
Q4 2013
Details

Project Site Office

Scope of works generally comprises works related to the construction of the Project site offices, specifically construction of:

  • Two-storey office building (capacity circa 255)

  • Masjid – 150 m2

  • Canteen with kitchen (capacity circa 60)

  • Visitor centre and model display building – 850 m2

  • Mock-up/Sample building – 225 m2

  • Utility compound – 625 m2

  • Shaded car parking – 150 No.

  • Roads and hard landscaping – 13,000 m2

  • Open parking – 6,000 m2

  • Security booths, barriers and fencing

  • Buried utilities, tanks and generators
x
Details

QSEC

P.O Box 24594

Doha, Qatar

Tel:+974.4458.0286

Fax:+974.4462.0346

Website: www.qsecqatar.net

x
NPP/0025: Production of Documentary for New Port Project Al Jazeera Documentary Channel
QAR 23,023,000
Q1 2013
Q4 2016
Details

Production of Documentary for New Port Project

N/A

x

Details

Al Jazeera Documentary Channel

TV Roundabout.

P.O Box 23123.

Doha, Qatar

Tel:+974.4489.6443

Fax:+974.4489.6447

Email: [email protected]

Website: http://www.aljazeera.net/doc

x
NPP/0035: QEZ3 Canal Excavation Quay Walls and Channel Dredging Hyundai Engineering and Construction Co. Ltd / Boskalis Westminster Middle East Ltd. Consortium
QAR 1,094,992,000
Q3 2013
Q1 2016
Details

QEZ3 Canal Excavation Quay Walls and Channel Dredging

Complete scope of work for construction of the quay walls and revetments bordering the basin, and site formation in a limited width band at the perimeter of the canal. Complete scope of work for mobilization, dredging of the access channel from its junction with the West Navigation Channel to the mouth of the Industrial Canal, construction of the breakwaters as required, and installation and commissioning of Navigation Aids along the Access Channel. Excavation of the canal basin to -7.5m CD deep.

Key Quantities:

  • Excavation of canal basin (m³) - 7,370,000

  • x
    Details

    Hyundai Engineering and Construction Co. Ltd / Boskalis Westminster Middle East Ltd. Consortium

    P.O. Box 24466

    Doha, Qatar

    Tel: +974 4455 0668

    Fax: +974 4467 8856

    x
    NPP/0036: Ship-to-Shore and Container Terminal Yard Cranes Shanghai Zhenhua Heavy Industries Co. Ltd
    QAR 871,683,915
    Q3 2013
    Q4 2015
    Details

    Ship-to-Shore and Container Terminal Yard Cranes

    Scope includes the design, manufacture, delivery fully erected and installation of Ship to Shore (STS) and Rubber Tyred Gantry cranes for the Container Terminal 1.

    Key Quantities:

  • Ship to Shore Cranes - 12

  • Rubber Tyred Gantry Cranes - 38

  • x
    Details

    Shanghai Zhenhua Heavy Industries Co. Ltd

    3261 Dongfang Road Shanghai,

    200125

    People Republic of China

    Tel: +86 21 3119 2538

    Fax: +86 21 5839 9555

    Email: [email protected]

    x
    NPP/0032: Commercial Terminals Infrastructure & Buildings HBK / Afcons
    QAR 820,000,000
    Q3 2013
    Q1 2016
    Details

    Commercial Terminals Infrastructure & Buildings

    All infrastructure and utility buildings required to construct the commercial terminals and associated logistics support facilities on the west side of the port basin.

    Key elements include: Paving, kerbs, painting, signage and furniture. Hard and soft landscaping, area lighting, etc. for facilities including the General Cargo Terminal, the Multi-Use Terminal, the Vehicle Processing Facility, the Mawashi Livestock & Hassad Food Company Livestock Processing Facilities and the Offshore Supply Base Terminal.

    Proposed GFA (m²):

  • Utility Building (Concrete) - 5,925

  • Utility Building (Steel) - 75

  • Commercial Terminal Building (Concrete) - 9,250

  • Commercial Terminal Building (Steel) - 26,750

  • Key Infrastructure Quantities:

  • HDPE Pipe (m) (Potable/Foul) - 60,000

  • PVC Underground Ducts (m) - 79,000

  • Stormwater Drainage Pipe (m) - 23,000

  • High Voltage Cables (m) - 11,000

  • x
    Details

    Commercial Terminals Infrastructure & Buildings

    TV Roundabout.

    P.O Box 1362.

    Doha, Qatar

    Tel:+974.4463.7111

    Fax:+974.4466.7053

    Email: [email protected]

    x
    NPP/0039: Independent Environmental Monitoring - QENFB & QEZ3 DAR Al-Handasah
    QAR 28,027,108
    Q4 2013
    Q4 2016
    Details

    Independent Environmental Monitoring

    The purpose of the services provided under NPP/0039 is to establish an independent environmental monitoring program throughout the construction period for the QEZ3 Canal and QENFB projects. The independent environmental monitoring constulant validates and verifies each construction contractor's own environmental compliance monitoring (e.g. for noise, dust, and exhaust emissions). In this way the project can independently verify compliance to the Qatari environmental legislation, Ministry of Environment requirements, and best practice environmental management. In addition to this verification montoring, the independent consultant working under NPP/0039 provides wider 'State of the Environment' monitoring to determine the presence and extent of cumulative project effects on the surrounding environment

    x
    Details

    Independent Environmental Monitoring

    DAR Al-Handasah.

    P.O Box 40358.

    Burj Al Gassar, West Bay, 8th Floor

    Doha, Qatar

    Tel:+974.4465.4800

    Fax:+974.4465.4989

    Email: [email protected]

    Website : http://www.dargroup.com/

    x
    NPP/0051: New Port & Qatari Emiri Naval Forces Base Master Systems Integration Consultant Lysys S.A.
    QAR 115,843,240
    Q1 2014
    Q1 2017
    Details

    New Port & Qatari Emiri Naval Forces Base Master Systems Integration Consultant

    Overview of Scope of MSIC Services

    The Master System Integration Consultancy Service will provide Systems scopes of work and Design and Build (D&B) tender documentation for the NP package and the QENFB package, followed by all stages of their implementation until the end of the defects liability periods.

    x
    Details

    New Port & Qatari Emiri Naval Forces Base Master Systems Integration Consultant

    Lysys S.A.

    P.O Box 55935

    UG Building

    Airport road

    Doha, Qatar

    Email: [email protected]

    Website : http://www.lysys.com/

    x
    NPP/0033: Port VTMS Transas Marine International AB
    QAR 17,657,363
    Q2 2014
    Q1 2016
    Details

    Port VTMS

    Overview of Scope of Port VTMS

    Scope includes the supply and installation of a Vessel Traffic Management System. Surveillance and communication equipment to support the Vessel Traffic Services as defined by the International Maritime Organization (IMO), including:

  • Communication System

  • Radar System

  • Hydrometeor Sensors

  • VTS Operations System

  • User Work Station

  • x
    Details

    Port VTMS

    Transas Marine International AB

    #120, Al Nasr Plaza, Oud Metha Road,Dubai,

    PO Box 117148

    United Arab Emirates

    Phone: +97 14 357 3625

    Fax: +97 14 357 3626

    Email: [email protected]

    x
    NPP/0037: QENFB Quay Wall and Basin Revetments CHEC
    QAR 615,400,000
    Q2 2014
    Q2 2016
    Details

    NPP/0037: QENFB Quay Wall and Basin Revetments

    Overview of Scope of QENFB Quay Wall and Basin Revetments

    Complete scope of work for construction of the quay walls (3.6 km quay walls), revetments along the basin perimeter and associated marine works.

    Key elements include: Dredging, reclamation and breakwater construction. Paving, drainage, lighting, firewater, etc. Navigation aids, walkways and floating pontoons, revetments and flood protection bunds along the basin perimeter. Key Quantities include :

  • Concrete Blocks (m³) - 400,000

  • Reinforcement Capping Block (t) - 4,000

  • Backfill (m³) - 300,000

  • x
    Details

    QENFB Quay Wall and Basin Revetments

    China Harbour Engineering Company (CHEC)

    P.O. Box 491

    10th floor, Al Mana Tower

    Doha, Qatar

    Tel: +974.4462.0117

    Fax:+974.4462.2517

    Email: [email protected]

    Website: www.chec.bj.cn/

    x
    NPP/0047: Centralized Customs Inspection Area CDC/Boom Construction
    QAR 862,800,000
    Q3 2014
    Q3 2016
    Details

    NPP/0047: Centralized Customs Inspection Area

    Overview of Scope of Centralized Customs Inspection Area

    The CCIA package comprises the design and construction of all infrastructure, utility (including utility buildings) and buildings located on a plot to the north of the new port basin. Key elements include: Paving, internal roadworks, traffic signages, power, wet utilities, instrumentation and controls, area lighting, security system, buildings, HVAC, fire protection, plumbing, X-Ray Scanners, telecommunications, hard and soft landscaping and irrigation.

    x

    Details

    NPP/0047: Centralized Customs Inspection Area

    Construction Development Company LLC & Boom Construction Company (Joint Venture)

    P.O. Box 8388

    Doha, Qatar

    Tel: +974.4409.3444

    Fax: +974.4409.3551

    x
    NPP/0054: Port Vessels Nakilat Daman Shipyards Qatar (NDSQ)
    QAR 305,071,680
    Q3 2014
    Q4 2016
    Details

    NPP/0054: Port Vessels

    NPP/0054: Port Vessels

    Scope includes the design and build of marine craft for the New Port. The vessels to be provided are 4no. Tugs Boats, (each with 70 T bollard-pull capacity), 3no. mooring boats and 4no Pilot boats, (each of Length over all 15.4m).The Contract has been placed with Nakilat Damen Shipyards Qatar with a value of QAR 305,071,680. The tugs boats will be delivered in Q3 and 4, 2016. The mooring boats will be delivered in Q2 2016.The Pilot Boats will be delivered in Q3 2016.

    x

    Details

    NPP/0054: Port Vessels

    Nakilat Damen Shipyards Qatar Ltd.

    Erhama bin Jaber al Jalahma Shipyard

    Southern Breakwater, Ras Laffan Industrial City

    P.O. Box 25551

    Doha, Qatar

    Website: http://www.ndsq.com.qa/

    x
    NPP/0057: Port Buildings and Infrastructure Sinohydro – UCE JV
    QAR 1,388,086,877
    Q4 2014
    Q4 2016
    Details

    NPP/0057: Port Buildings and Infrastructure

    NPP/0057: Port Buildings and Infrastructure

    The scope for the Joint Venture contractor includes the construction of 60 port buildings of various functional types and sizes, with a total Gross Floor Area (GFA) of approximately 78,000m². The buildings are spread over five separate zones within the New Port Project:

  • Coast Guard Terminal

  • Port Administration Area

  • Port Marine Unit

  • Southern Site Entrance/Exit Gate

  • Northern Site Entrance/Exit Gate

  • x

    Details

    NPP/0057: Port Buildings and Infrastructure

    United Construction Establishment

    Tel : +974 4468 6872/3/4

    Fax : +974 4468 6875

    P.O. Box 1851

    Doha, Qatar

    Website: http://www.uceqatar.com/

    x
    NPP/0038: Port Security Thales Communications and Security SAS
    QAR 499,833,487
    Q1 2015
    Q4 2016
    Details

    NPP/0038: Port Security

    NPP/0038: Port Security

    The Scope includes the following :

  • Integrated Security Management System

  • Command and Control Centre

  • Video Surveillance

  • IP based CCTV system (including mounts, masts, cameras, video recorders ,etc)

  • Automatic Access Controls

  • Port Security Control Room (SCR)

  • CCTV Video recording Primary & Secondary

  • Installation of security equipment in Primary and Secondary Data Centre

  • Systems Integration and interfaces with Port Security System

  • UPS

  • Security Network and infrastructure

  • Port perimeter fence

  • Security lighting

  • Automatic number plate recognition systems

  • Port Security Control Room (SCR) installation

  • Terminal Security Control Rooms (SCR) installation

  • Secure IT Equipment Rooms (SITER) installation

  • Port wide Radio communication systems (TETRA) .

  • Security Systems Integration (Interface management with CAD, BIM, BMS, FDAS, RFID MSIC and other Port Operator systems)

  • Liaisons for the purpose of design integration with all stakeholders, MSIC and the NPP Building Contractors and Infrastructure Contractors including preparation and gaining approval of suitable installation details prior to commencement of construction

  • x

    Details

    NPP/0038: Port Security

    Thales Communication and Security SAS

    20-22 rue Grange Dame Rose-CS 90519

    78141 Velizy Cedex - France

    Tel : +33(0)1 73 32 00 00

    Fax: +33(0)1 73322022

    Email: [email protected]

    x
    NPP/0050: QENFB Infrastructure and Utility Buildings Qatar Building Company/MSF Engenharia S.A. Joint Venture
    QAR 1,553,395,868
    Q4 2014
    Q1 2017
    Details

    NPP/0050: QENFB Infrastructure and Utility Buildings

    NPP/0050: QENFB Infrastructure and Utility Buildings

    Scope is the complete infrastructure for the new Qatar Emri Naval Base (QENFB) inclusive of:

  • 55km of roads

  • Utility Yard with pump stations, water tanks, Fuel and Compressed air

  • 8 Main Substations, 5 Road lighting Substations with generators, (22KV)

  • Sewage Treatment Plant (Design & Build)

  • Telecom Building for QESC

  • ALL Utility Services :

  • Foul Sewer GRP & HDPE,

  • TSE,

  • Storm Drainage,

  • Portable Water,

  • Fire Water,

  • Fuel,

  • Compressed Air,

  • 22KV network Duct banks

  • Port Security Control Room (SCR) installation,

  • Telecom/ELV network Duct banks,

  • Street Lighting,

  • 6 Foul Water Pump Stations,

  • Temporary works (offices etc).

  • Coordination with Quay Wall contractor (NPP/0037), Buildings Contractors (NPP/0061,62,63) and Security Contractor (NPP/0058) as well as others.

  • x

    Details

    NPP/0050: QENFB Infrastructure and Utility Buildings

    QBC-MSF JV

    Po Box 1985

    Doha,Qatar

    Tel : +974 4462 5555

    Fax : +974 4462 5544

    Website: http://www.qatarbuildingcompany.com/

    Website: http://www.msf.pt/msf_EN/grupomsf.aspx/

    x
    NPP0064: Port Buildings and Infrastructure - Package 2 Construction Development Company
    QAR 540,000,000
    Q1 2015
    Q4 2016
    Details

    NPP0064: Port Buildings and Infrastructure - Package 2

    NPP0064: Port Buildings and Infrastructure - Package 2

    The scope of work in NPP/0064 is restricted to design elements, construction, commissioning and handover of 7 buildings and associated infrastructure in the CP13 and CP14 areas only, supplementary to the buildings and infrastructure in the CP13 and CP14 areas constructed under separate Contract NPP/0057.

    The buildings are: main Port administration building- The Control tower and the customs main administration building with 2 chiller farms and 2 substations. The total GFA is around: 33,832 m2

    The scope of work which applies to the Port Buildings – Package 2 includes but is not limited to the following:

  • Design elements,

  • Excavation and earthwork,

  • Concrete work,

  • Brickwork and block-work,

  • Roofing,

  • Structural steelwork,

  • Metal Works,

  • Plumbing and engineering installations,

  • Electrical installations,

  • Plasterwork and other floor, wall and ceiling finishes,

  • Painting and decorating,

  • Drainage,

  • Passive / Active Fire and Life Safety Systems,

  • Building Management Systems,

  • Making connections to incoming utilities and outgoing services.,

  • The scope of work for the Infrastructure which is required to join with the infrastructure constructed in NPP/0057 extends to a nominal distance of 5 meters from the perimeter of the buildings referred to above, or to such other extent, comprising the following: :

  • Design Elements,

  • Earth Works,

  • Potable water supply system and connection to incoming mains,

  • Fire water supply system,

  • Irrigation water supply system,

  • Foul water collection system,

  • Storm water drainage system,

  • Instrumentation and Automation systems,

  • Telecommunication – underground ducts/conduits network,

  • Fire protection and life safety,

  • Area lighting,

  • Paving, Landscaping and irrigation,

  • Electrical works and connection to Kahramaa substation,

  • Cooling Water System and electrical works associated with utility buildings.

  • x

    Details

    NPP0064: Port Buildings and Infrastructure - Package 2

    Construction Development Company LLC

    Building No.29, Street 840, Zone 24,

    Al Rawabi Str, Al Muntazah,

    Po Box 8388,

    Doha, Qatar

    Tel : +974 4409 3444

    Fax : +974 4409 3555

    Website: http://www.cdc-qatar.com/CDC/home

    x
    NPP/0066: Lagoon Infill Gulf Earth Moving W.L.L
    QAR 239,955,531
    Q2 2015
    Q2 2016
    Details

    NPP/0066: Lagoon Infill

    NPP/0066: Lagoon Infill

    The Lagoon area is approximately 2,968,121 m2 at an average existing level of +1.60 m CD. The Lagoon area will be filled to a level of +4.5 m CD, requiring approximately 9,000,000 m3 of fill material.

    x

    Details

    NPP/0066: Lagoon Infill

    Gulf Earth Moving W.L.L

    Po Box 55827,

    Doha, Qatar

    Tel : +974 4464 6842

    Fax : +974 4498 6394

    Website: http://www.gulfearthmoving.com/home/

    x
    NPP/0053: General Port Equipment - Mobile Harbour Cranes Liebherr-Werk Nenzing GmbH
    QAR 47,798,030.08
    Q4 2015
    Q3 2016
    Details

    NPP/0053: General Port Equipment - Mobile Harbour Cranes

    NPP/0053: General Port Equipment - Mobile Harbour Cranes

    Within the scope of this package the New Port Project shall be purchasing the plant and equipment as detailed below on a supply & installation basis:

  • Mobile harbour cranes; capable of handling 50,000 DWT vessels.

  • Crane spreaders.
  • The required quantity of the Mobile Harbour Cranes & Spreaders:

  • 7 Nr Mobile harbour cranes; capable of handling 50,000 DWT vessels.

  • 6 Nr Crane spreaders.

  • x
    Details

    NPP/0053: General Port Equipment - Mobile Harbour Cranes

    Liebherr-Werk Nenzing GmbH

    Dr. Hans Liebherr Strabe 1,

    Po Box 6710,

    Nenzing, Austria

    Tel : +43 50809 41207

    Fax : +43 50809 41447

    Website: http://www.liebherr.com

    x
    NPP/0067: Port Master Systems Integration Salam Technology O.P.C.
    QAR 1,177,075,000
    Q4 2015
    Q1 2017
    Details

    NPP/0067: Port Master Systems Integration

    NPP/0067: Port Master Systems Integration

    The scope of this package include Design, Installation & Commission of Port Wide Master Systems Integration.

    x
    Details

    NPP/0067: Port Master Systems Integration

    Salam Technology O.P.C.

    Po Box 22658,

    Doha, Qatar

    Tel : +974 4487 4966

    Fax : +974 4487 4980

    Website: http://www.salamtechnology.com/

    x
    NPP/0041A: Forklifts Rumaillah Motors W.L.L
    QAR 45,861,667
    Q3 2016
    Q1 2017
    Details

    NPP/0041A: Forklifts

    NPP/0041A: Forklifts

    Within the scope of this package the New Port Project shall be purchasing the plant and equipment as detailed below on a supply & installation basis:

    • Heavy duty forklifts, maximum lifting capacity of 45t.

    • Light duty forklifts of low profile, lifting capacity of 3t.

    • Light duty high profile, with a lifting capacity of 9 and 5t.

    • Small forklifts, with a lifting capacity of 4t.

    • Empty container handlers, with lifting capacity of 9t.

    • Reach stackers, with a safe working load of 41t.

    • Electric Pallet Trucks

    x
    Details

    NPP/0041A: Forklifts

    Rumaillah Motors W.L.L

    St 23, Gate 21, Salwa Ind Area

    Po Box 2,

    Doha, Qatar

    Tel : +974 4460 6091

    Fax : +974 4460 6092

    x
    NPP/0041B: Forklifts Abdullah Abdulghani & Bros Co. W.L.L.
    QAR 6,594,691
    Q3 2016
    Q1 2017
    Details

    NPP/0041B: Forklifts

    NPP/0041B: Forklifts

    Within the scope of this package the New Port Project shall be purchasing Heavy forklifts and empty container handler

    x
    Details

    NPP/0041B: Forklifts

    Abdullah Abdulghani & Bros Co. W.L.L.

    St 10,Main Service-Industrial Area St. 6,

    Doha, Qatar

    Tel : +974 4450 1967

    Fax : +974 4450 1952

    x
    NPP/0042: Tractors Milaha Trading Company W.L.L
    QAR 52,096,000
    Q3 2016
    Q2 2017
    Details

    NPP/0042: Tractors

    NPP/0042: Tractors

    Within the scope of this package the New Port Project shall be purchasing the plant and equipment as detailed below on a supply & installation basis:

  • Terminal Tractors, capable of hauling a GCW of 80t.

  • The required quantity of the Tractor:

  • 94Nr (92 4x2 tractor and 2 4x4 Ro-Ro tractor) Terminal Tractors, capable of hauling a GCW of 80 tonnes.

  • x
    Details

    NPP/0042: Tractors

    Milaha Trading Company W.L.L

    Po Box 53,

    Doha, Qatar

    Tel : +974 4494 9666

    x
    NPP/0043: Trailers Novatech Aps
    QAR 14,035,060
    Q2 2016
    Q3 2016
    Details

    NPP/0043: Trailers

    NPP/0043: Trailers

    The scope of this package include Supply of the following Equipments:

  • Bomb Cart - 62 no. + 22 max. optional within 2 years,

  • Spreader bar Trailers - 4 no.

  • MAFI Type Trailers (80 Tonnes) - 42 no. _ 11 mx. optional within 2 years

  • MAFI Type Trailers ( 100) - 2 no

  • x

    Details

    NPP/0043: Trailers

    Novatech Aps

    Skudehavnsvej 30,9000 Aalborg,

    Denmark

    Tel : +45 9816 5009

    Fax : +45 9816 8097

    x
    NPP/0045A: Fire Fighting Equipment Al Hamad Trading Establishment
    QAR 18,902,951
    Q3 2016
    Q4 2017
    Details

    NPP/0045A: Fire Fighting Equipment

    NPP/0045A: Fire Fighting Equipment

    Within the scope of this package the New Port Project shall be purchasing the plant and equipment as detailed below on a supply & installation basis:

    • Dangerous materials vehicle (nuclear, biohazard, chemical).

    • Water tankers up to 36,000l (locomotive and trailer system).

    • Water suction pumps and Mobile lighting unit.

    Heavy fire fighting vehicles (capacity: water of 6000 liters & foam of 500 liters and with centrifugal fire pump complete with ancillary equipment)

    Medium fire fighting vehicles (capacity: water of 2000 liters & foam of 200 liters and with centrifugal fire pump complete with ancillary equipment)

    Heavy emergency rescue vehicles (with storage lockers, cable winch, generator, hydraulic pump and crane complete with ancillary equipment)

    Fire fighting water tank (capacity of 15,000 liters with centrifugal fire pump and electrical system)

    Decontamination unit (water capacity of 1,500 liters with 20KVA power generator)

    The driver’s cabin type and capacity for all fire fighting vehicles shall be as follows:

    • Forward control type with hydraulically operated tilting.

    • Fitting for 1 driver and 6 crew and 5 fire fighting crew.

    The fire fighting water tanker should fit for 1 driver and 3 crew with 2 fire fighting crew.

    In addition, no specific certificate is required but all should be in compliance with the specifications before acceptance by the purchaser.

    The required quantity of the fire fighting equipment:

    • 2Nr Heavy fire fighting vehicles.

    • 1Nr Medium Fire fighting vehicles.

    • 1Nr Heavy emergency rescue vehicle - foam tower.

    • 1Nr Heavy emergency rescue vehicle.

    • 1Nr Fire fighting vehicle – ladder 32m.

    • 1Nr Dangerous Materials vehicle (nuclear, biohazard, chemical).

    • 2Nr Fire fighter water tankers 36,000l.

    • 1Nr Fire fighting water tanker – Tractor and Trailer.

    • 1Nr Water suction pumps.

    • 2Nr Mobile lighting unit.

    x
    Details

    NPP/0045A: Fire Fighting Equipment

    Al Hamad Trading Establishment

    30, Mohd Almana Bldg., Next to Doha Bank,

    Ayn Khalid, Salwa Road,,

    Doha, Qatar

    Tel : +974 4468 8220

    Fax : +974 4468 8485

    x
    NPP/0045B: Fire Fighting Equipment Fahed Trading & Contracting W.L.L
    QAR 18,902,951
    Q3 2016
    Q4 2017
    Details

    NPP/0045B: Fire Fighting Equipment

    NPP/0045B: Fire Fighting Equipment

    Within the scope of this package the New Port Project shall be purchasing the plant and equipment as detailed below on a supply & installation basis:

    • Dangerous materials vehicle (nuclear, biohazard, chemical).

    • Water tankers up to 36,000l (locomotive and trailer system).

    • Water suction pumps and Mobile lighting unit.

    Heavy fire fighting vehicles (capacity: water of 6000 liters & foam of 500 liters and with centrifugal fire pump complete with ancillary equipment)

    Medium fire fighting vehicles (capacity: water of 2000 liters & foam of 200 liters and with centrifugal fire pump complete with ancillary equipment)

    Heavy emergency rescue vehicles (with storage lockers, cable winch, generator, hydraulic pump and crane complete with ancillary equipment)

    Fire fighting water tank (capacity of 15,000 liters with centrifugal fire pump and electrical system)

    Decontamination unit (water capacity of 1,500 liters with 20KVA power generator)

    The driver’s cabin type and capacity for all fire fighting vehicles shall be as follows:

    • Forward control type with hydraulically operated tilting.

    • Fitting for 1 driver and 6 crew and 5 fire fighting crew.

    The fire fighting water tanker should fit for 1 driver and 3 crew with 2 fire fighting crew.

    In addition, no specific certificate is required but all should be in compliance with the specifications before acceptance by the purchaser.

    The required quantity of the fire fighting equipment:

    • 2Nr Heavy fire fighting vehicles.

    • 1Nr Medium Fire fighting vehicles.

    • 1Nr Heavy emergency rescue vehicle - foam tower.

    • 1Nr Heavy emergency rescue vehicle.

    • 1Nr Fire fighting vehicle – ladder 32m.

    • 1Nr Dangerous Materials vehicle (nuclear, biohazard, chemical).

    • 2Nr Fire fighter water tankers 36,000l.

    • 1Nr Fire fighting water tanker – Tractor and Trailer.

    • 1Nr Water suction pumps.

    • 2Nr Mobile lighting unit.

    x
    Details

    NPP/0045A: Fire Fighting Equipment

    Fahed Trading & Contracting W.L.L

    56 Mamora, 340 Salwa Road,

    P.O Box : 8877,

    Doha, Qatar

    Tel : +974 4432 0000

    Fax : +974 4692 2244

    x
    NPP/0071: Mobile Cranes Qatar Tractors & Equipment Co. W.L.L
    QAR 51,931,380
    Q3 2016
    Q2 2017
    Details

    NPP/0071: Mobile Cranes

    NPP/0071: Mobile Cranes

    Within the scope of this package the New Port Project shall be purchasing the plant and equipment as detailed below on a supply & installation basis:

  • Mobile cranes; with lifting capacity of 90t (radius of 3m).

  • The required quantity of the Mobile Cranes:

  • 12 Nr Mobile cranes; with lifting capacity of 90t (radius of 3m).

  • x
    Details

    NPP/0071: Mobile Cranes

    Qatar Tractors & Equipment Co. W.L.L

    St 29, Gate 1, Salwa Ind Area

    Po Box 5257,

    Doha, Qatar

    Tel : +974 4460 2946

    Fax : +974 4460 2022

    x
    NPP/0089: Advanced Port Complex Al Hamadi
    QAR 95,902,951
    Q3 2016
    Q1 2017
    Details

    NPP/0089: Advanced Port Complex

    NPP/0089: Advanced Port Complex

    Construction of office buildings (new and relocated), road network extension, associated utilities, car parking, security, landscaping and facilities management.

    x
    Details

    NPP/0089: Advanced Port Complex

    Al Hamadi

    Street 27, Gate 73 Industrial Area,

    Doha, Qatar

    Tel : +974 4460 0419

    Fax : +974 4450 5570

    x
    NPP/0065: Visitors Centre Al Jaber Trading and Contracting
    QAR 189,898,085
    Q1 2017
    Q2 2019
    Details

    NPP/0065: Visitors Centre

    NPP/0065: Visitors Centre

    The project scope includes the Design and Build (D&B) of a Visitor Centre building at the Port Administration Area. The Contractor, in addition to the Construction Works, shall provide full design services and construction-phase services for the Visitor Centre, grounds and ancillaries to facilitate the operations and maintenance of the Visitor Centre, including an Aquarium, Exhibition/Museum, Auditorium, furniture, fixtures and equipment (FF&E).

    x
    Details

    NPP/0065: Visitors Centre

    Al Jaber Trading and Contracting

    P.O. Box: 1120

    Doha, Qatar

    Tel : +974 4432 3737

    Fax : +974 4432 3168

    x
    NPP/0087: Port Access Roads Landscaping Al Nakheel Landscapes
    QAR 90,000,000
    Q1 2017
    Q1 2018
    Details

    NPP/0087: Port Access Roads Landscaping

    NPP/0087: Port Access Roads Landscaping

    Design and Build (D&B) of the streetscape elements including Entrance Monument at the Central Road Access road corridor and Way Finding Signage for each terminal. The Contractor, in addition to the Construction Works, shall provide full design services and construction-phase services for these, including earthworks, hardscaping, planting, lighting, street furniture and special features.

    x

    Details

    NPP/0087: Port Access Roads Landscaping

    Al Nakheel Landscapes

    P.O. Box: 8873

    Doha, Qatar

    Tel : +974 4408 5333

    Fax : +974 4498 3420

    x
    NPP/0073: Furniture, Fixtures and Equipment Abmak Qatar WLL, Alshaya International, Darwish Trading, Global Art W.L.L,Gulf Office Solutions, Salam Enterprises
    QAR 49,823,950
    Q3 2017
    Q1 2018
    Details

    NPP/0073: Furniture, Fixtures and Equipment

    NPP/0073: Furniture, Fixtures and Equipment

    Supply and Installation of FF&E to buildings within the Commercial Terminals, Customs Inspection Area and Port Buildings – Packages 1 and 2

    x

    Details

    NPP/0073: Furniture, Fixtures and Equipment

    Abmak Qatar WLL

    Tel : +974 4468 8908

    Website: http://www.abmak.com/

    Alshaya International

    Tel : +974 4469 2459

    Website: http://www.darwish-tdg.qa/

    Global Art W.L.L

    Tel : +974 4432 2466

    Website: http://www.globalart-qatar.com/

    Salam Enterprises

    Tel : +974 4487 8921

    Website: http://www.salamenterprisesllc.com/

    x
    NPP/0085: Strategic Food Security Facilities Al Jaber Engineering
    QAR 1,665,000,000
    Q3 2017
    Q3 2019
    Details

    NPP/0085: Strategic Food Security Facilities

    NPP/0085: Strategic Food Security Facilities

    The facilities of the project will be developed and constructed on an area of approximately 53 hectares (about 530,000 square meters). The project consists of specialized facilities for the processing, manufacturing and refining of rice, raw sugar and edible oils. These products will be available for local, regional and global use. The project also includes bulk storage silos with their associated infrastructure and conveyance equipment, in addition to the fundamental structures fully equipped for the project associated operations of handling, processing, packaging, reloading and transport. One more feature of the project will be a specialized facility for the recycling of waste products arising from the processing of basic commodities to create regulatory compliant animal feed and food stocks. Those facilities will operate as a fully functional standalone terminal, while 500 meters of the wharf of the port will be dedicated for the berthing and discharging of the ships.

    x

    Details

    NPP/0085: Strategic Food Security Facilities

    Al Jaber Engineering

    Tel : +974 4040 9600

    Website: http://www.jec.qa/

    x
    NPP/0086: Phase 2 Master Plan & Design Services Worley Parsons
    QAR 51,000,000
    Q3 2017
    Q3 2022
    Details

    NPP/0086: Phase 2 Master Plan & Design Services

    NPP/0086: Phase 2 Master Plan & Design Services

    Scope of Services includes: Planning Services for: Facilities Capacity Analysis; Market Analysis and Forecasts; Conceptual Plan; Traffic Modelling; Plan Implementation and the following Design Services: Detailed Design of Automated Container Terminal 2; Support during Tender and Evaluation and Construction Phase Support.

    x

    Details

    NPP/0086: Phase 2 Master Plan & Design Services

    Worley Parsons

    Al Mana Tower, 8th floor

    Suhaim Bin Hamad Street C-Ring Road

    Doha, Qatar

    Tel : +974 4499 9777

    Tel : +974 4499 9800

    Website: www.worleyparsons.com

    x

    نطاق العمل والعنوان نهاية العقد المتوقعة بداية العقد مبلغ العقد المقاول/الاستشاري المناقصة
    تفاصيل الربع الأول 2008 الربع الثاني 2007 قطري 19,628,113 سكوت ويلسون إستشاري تخصصية – موقع الميناء ودراسات: NDPP/0001
    تفاصيل الربع الثاني 2008 الربع الأول 2008 ريال قطري 5,128,099 جيمس دراسات الموقع البرية والبحرية: NDPP/0001B
    تفاصيل الربع الثالث 2016 الربع الرابع 2008 ريال قطري 121,724,046 ورلي بارسون إستشاري التصاميم الهندسية للمشروع: NDPP/0002
    تفاصيل الربع الثالث 2016 الربع الرابع 2008 ريال قطري 543,746,145 إيكوم استشاري إدارة برامج المشروع: NDPP/0003
    تفاصيل الربع الثالث 2016 الربع الأول 2009 ريال قطري 26,421,566 كووي أ/س إستشاري الخدمات البيئية: NDPP/0004
    تفاصيل الربع الرابع 2011 الربع الثالث 2009 ريال قطري 22,520,102 جيمس دراسات بيئية إضافية: NDPP/0005
    تفاصيل الربع الأول 2012 الربع الثاني 2010 ريال قطري 2,063,413 المختبرات الصناعية عينات بيئية وإختبارات هيدرولوجية لموقع المشروع: NDPP/0011
    تفاصيل الربع الثالث 2015 الربع الأول 2011 3,204,800,000 ريال قطري شاينا هاربر إنجينيرينج المحدودة حفر قاع الميناء وكاسر الأمواج: NDPP/0009
    تفاصيل الربع الثاني 2016 الربع الأول 2011 ريال قطري 50,454,926 دار الهندسة، الشاعر وشركائه دراسات بيئية إضافية: NDPP/0012
    تفاصيل الربع الأول 2016 الربع الثاني 2011 ريال قطري 547,500 جاردن لوويد تومسون خدمات تأمين المشروع: NDPP/0014
    تفاصيل الربع الثالث 2016 الربع الثاني 2011 ريال قطري 2,593,450 مختبرات الخليج ذ.م.م عينات وإختبارات بيئية: NDPP/0010
    تفاصيل الربع الأول 2012 الربع الثالث 2011 ريال قطري 10,550,253 شركة المصطفوي للتجارة والمقاولات ذ. م. م. دراسة جيولوجية الأرض وقياسات الأرصاد البحرية للمنطقة الإقتصادية الثالثة: NDPP/0015
    تفاصيل الربع الرابع 2012 الربع الثالث 2011 ريال قطري 4,537,586 بورتيا المحدودة إستشاري تشغيل الميناء: NDPP/0032
    تفاصيل الربع الثالث 2015 الربع الثالث 2011 ريال قطري 12,180,500 شركة المصطفوي للتجارة والمقاولات ذ. م. م. أعمال المسـح (البرية و البحرية): NDPP/0020
    تفاصيل الربع الرابع 2015 الربع الرابع 2011 ريال قطري 12,063,417 شركة فوجرو خدمات الإختبارات المستقلة: NDPP/0021
    تفاصيل الربع الثاني 2012 الربع الأول 2012 ريال قطري 1,165,000 شركة إرنست أند يونج خدمات الموارد البشرية: NPP/0027
    تفاصيل الربع الأول 2016 الربع الأول 2012 4,492,753,133 ريال قطري شركة الشرق الأوسط للجرف حفر القناة البحرية: NPP/0013
    تفاصيل الربع الثاني 2016 الربع الثالث 2012 وفق الاستشارة سايمنز أند سايمنز الخدمات القانونية: NPP/0028
    تفاصيل الربع الثالث 2016 الربع الثالث 2012 ريال قطري 24,999,757 شركة قطر للخدمات الأمنية خدمات الحماية الأمنية خلال فترة الإنشاءات (مرحلة البناء): NPP/0024
    تفاصيل الربع الأول 2014 الربع الرابع 2012 ريال قطري 34,065,627 سبي لخدمات النفط والغاز خدمات توفير كوادر تخصصية عند الطلب: NPP/0030
    تفاصيل الربع الثالث 2014 الربع الرابع 2012 ريال قطري 31,500,000 المكتب العربي للإستشارات الهندسية إستشاري تصاميم المباني الحكومية: NPP/0017
    تفاصيل الربع الأول 2016 الربع الأول 2013 ريال قطري 1,064,966,000 شركة التيسيير للمقاولات وشركة اتحاد المقاولين بناء رصيف الحاويات ، البنية التحتية ومباني الخدمات: NPP/0026
    تفاصيل الربع الثاني 2016 الربع الأول 2013 ريال قطري 176,069,403 جماعة المهندسين الإستشاريين إستشاري تصاميم مباني القاعدة البحرية: NPP/0018
    تفاصيل الربع الرابع 2013 الربع الأول 2013 ريال قطري 49,783,327 الشركة القطرية للهندسة المتخصصة والإنشاءات ذ م م مكاتب المشروع في الموقع: NPP/0034
    تفاصيل الربع الرابع 2016 الربع الأول 2013 ريال قطري 23,023,000 قناة الجزيرة الوثائقية إنتاج أفلام وثائقية لمشروع الميناء الجديد خلال فترة الإنشاءات: NPP/0025
    تفاصيل االربع الأول 2016 الربع الثالث 2013 ريال قطري 1,094,992,000 هيونداي للهندسة والانشاءات/بوسكالس ويستمنستر الشرق الأوسط حفر حوض وبناء جدار الرصيف وحفر القناة البحرية في المنطقة الإقتصادية الثالثة: NPP/0035
    تفاصيل الربع الرابع 2015 الربع الثالث 2013 ريال قطري 871,683,915 شنغهاي زهنهوا للصناعات الثقيلة رافعــات حــاويــات في ساحة الميناء والسفن إلى الشاطئ: NPP/0036
    تفاصيل الربع الأول 2016 الربع الثالث 2013 ريال قطري 820,000,000 شركة حمد بن خالد للمقاولات وشركة أفكونز البنية التحتية ومباني الخدمات للمحطات التجارية: NPP/0032
    تفاصيل الربع الرابع 2016 الربع الرابع 2013 ريال قطري 28,027,108 دار الهندسة ، الشاعر وشركائه المراقبة البيئية للمنطقة الإقتصادية الثالثة والقاعدة البحرية الأميرية القطرية: NPP/0039
    تفاصيل الربع الأول 2017 الربع الأول 2014 ريال قطري 115,843,240 ليسيس ذ م م تعيين إستشاري النظم المتكاملة الرئيسية في الميناء الجديد والقاعدة البحرية الأميرية القطرية :NPP/0051
    تفاصيل الربع الأول 2016 الربع الثاني 2014 ريال قطري 17,657,363 ترانساس مارين أنترناشيونال نظام إدارة ومراقبة السفن للميناء VTMS: NPP/0033
    تفاصيل الربع الثاني 2016 الربع الثاني 2014 ريال قطري 615,400,000 شاينا هاربر إنجينيرينج المحدودة بناء جدران الأرصفة البحرية وسواتر حوض الميناء للقاعدة البحرية الأميرية القطرية: NPP/0037
    تفاصيل الربع الثالث 2016 الربع الثالث 2014 ريال قطري 862,800,000 سي دي سي / بووم للإنشاءات المنطقة المركزية للتفتيش الجمركي: NPP/0047
    تفاصيل الربع الرابع 2016 الربع الثالث 2014 ريال قطري 305,071,680 ناقلات دامن شيبياردز قطر المحدودة قوارب الميناء: NPP/0054
    تفاصيل الربع الرابع 2016 الربع الرابع 2014 ريال قطري 1,388,086,877 ساينوهايدرو / الشركة المتحدة للإنشاءات (شريك محالف) مباني الميناء والبنية التحتية: NPP/0057
    تفاصيل الربع الرابع 2016 الربع الأول 2015 ريال قطري 499,833,487 ثالس للإتصالات ونظم الأمن أنظمة الأمن بالميناء (مرحلة التشغيل) - (توريد وتركيب وتشغيل الأنظمة الأمنية): NPP/0038
    تفاصيل الربع الأول 2017 الربع الرابع 2014 ريال قطري 1,553,395,868 التحالف المشترك لشركة البناء القطرية/إم إس إف إنجنهاريا البنية التحتية و مباني الخدمات لقاعدة القوات البحرية الأميرية القطرية: NPP/0050
    تفاصيل الربع الرابع 2016 الربع الأول 2015 ريال قطري 540,000,000 شركة الإنشاءات الإنمائية مباني الميناء و البنية التحتية - الحزمة 2 : NPP/0064
    تفاصيل الربع الثاني 2016 الربع الثاني 2015 ريال قطري 239,955,531 جلف إيرث موفينج ردم البحيرة : NPP/0066
    تفاصيل الربع الثالث 2016 الربع الرابع 2015 ريال قطري 47,798,030.08 لييبهير رافعات الميناء المتنقلة: NPP/0053
    تفاصيل الربع الأول 2017 الربع الرابع 2015 ريال قطري 1,177,075,000 السلام للتكنولوجيا النظم الرئيسية المتكاملة: NPP/0067
    تفاصيل الربع الأول 2017 الربع الثالث 2016 ريال قطري 45,861,667 الرميلة للسيارات ذ.م.م معــدات المينـاء العامــة – رافعات شوكية :NPP/0041A
    تفاصيل الربع الأول 2017 الربع الثالث 2016 ريال قطري 6,594,691 اخوانه عبد الله عبد الغني و ذ.م.م معــدات المينـاء العامــة – رافعات شوكية :NPP/0041B
    تفاصيل االربع الثاني 2016 لربع الثالث 2016 ريال قطري 52,096,000 شركة للتجارة ذ.م.م معــدات المينـاء العامــة – قاطرات:NPP/0042
    تفاصيل الربع الثالث 2016 الربع الثاني 2016 ريال قطري 14,035,060 نوفاتيك أبس معــدات المينـاء العامــة – قاطرات :NPP/0043
    تفاصيل الربع الرابع 2017 الربع الثالث 2016 ريال قطري 18,902,951 مؤسسة حمد للتجارة معــدات المينـاء العامــة – معدات مكافحة الحرائق :NPP/0045A
    تفاصيل الربع الرابع 2017 الربع الثالث 2016 ريال قطري 18,902,951 فهد تجارة والمقاولات ذ.م.م معــدات المينـاء العامــة – معدات مكافحة الحرائق:NPP/0045B
    تفاصيل الربع الثالث 2017 الربع الثالث 2016 ريال قطري 51,931,380 قطر الجرارات والمعدات المحدودة ذ.م.م الرافعات المتنقلة:NPP/0071
    تفاصيل الربع الأول 2017 الربع الثالث 2016 ريال قطري 95,902,951 الحمادي مجمع مباني الميناء المؤقت :NPP/0089
    تفاصيل الربع الثاني 2017 الربع الأول 2017 ريال قطري 189,898,085 شركة الجابر للتجارة والمقاولات إنشاء مركز الزوار في مشروع الميناء الجديد :NPP/0065
    تفاصيل الربع الأول 2018 الربع الأول 2017 ريال قطري 90,000,000 شركة النخيل تصميم الآراضي لطرق الدخول للميناء :NPP/0087
    تفاصيل الربع الأول 2018 الربع الثالث 2017 ريال قطري 49,823,950 شركة إي بي ماك قطر,شركة الشايع العالمية,شركة الدرويش للتجارة,شركة الفن العالمي (جلوبال أرت),شركة الخليج للحلول المكتبية,شركة مشاريع السلام. الأثاث، التجهيزات الثابتة والمعدات :NPP/0073
    تفاصيل الربع الثالث 2019 الربع الثالث 2017 ريال قطري 1,665,000,000 شركة هندسة الجابر تصميم وبناء مرافق مباني ومخازن الأمن الغذائي :NPP/0085
    تفاصيل الربع الثالث 2022 الربع الثالث 2017 ريال قطري 51,556,338 ورلي بارسونز المخطط الرئيسي للمرحلة الثانية وخدمات التصميم لمحطتي الحاويات الثانية والثالثة :NPP/0086